Page 340 - CATALOG
P. 340
EVER CLEAR
Ever Clear (indoor or outdoor use)
ECL12ZSAT
Ever Clear is a clear, air drying two part urethane coating 12 oz. Aerosol Spray
Ever Clear 2K Satin
designed to provide the best and strongest protection for ECL32ZSAT
most surfaces and finishes. We have been able to reduce 32 oz. Ever Clear 2K Satin
the VOCs and also improve the two part formula. ECL01GSAT
1 gallon Ever Clear 2K Satin
Ever Clear is not a water based formula. Use Sculpt
Nouveau Solvent Thinner when reducing Ever Clear ECL12ZMAT
in order to keep the VOC level low. Ever Clear tacks up 12 oz. Aerosol Spray
Ever Clear 2K Matte
quickly and should be used for the difficult finishes such as ECL32ZMAT
counter-tops, fountains, or ocean environments. It works 32 oz. Ever Clear 2K Matte
extremely well on all metals, wood, terracotta, ceramics, ECL01GMAT
and concrete. Ever Clear provides unusually strong 1 gallon Ever Clear 2K Matte
under-film tarnish protection. When deciding which
two part clear coating to choose, Ever Clear would be the ECL12ZGLS
12 oz. Aerosol Spray
best in all circumstances as it will be compliant with the Ever Clear 2K Gloss
EPA, it is strong, clear, and has a fast tack time. Full cure ECL32ZGLS
32 oz. Ever Clear 2K Gloss
time is 5 to 7 days. ECL01GGLS
Handling/Mixing: 1 gallon Ever Clear 2K Gloss
Combine Sculpt Nouveau’s Ever Clear Parts A and B at a
3:1 ratio. First, thoroughly mix Part A first and then mix ECL12ZSUG
Part A with Part B for 10 minutes. It is important to mix 12 oz. Aerosol Spray
Ever Clear 2K Super Gloss
thoroughly to fully blend the two parts. It is recommended ECL32ZSUG
before using coating to let it sit for 10 - 15 minutes in an 32 oz. Ever Clear 2K Super Gloss
opaque covered container. Allow the coating to adjust to ECL01GSUG
room temperature (70°F– 85°F). Filter the Ever Clear with 1 gallon Ever Clear 2K Super Gloss
supplied 18 micron filter. Pot life is approximately 6 hours.
Do not use after this amount of time.
Surface Prep
Surfaces to be coated must be sound, clean, dry and free from grease, oil and other contaminants. Do not use
acetone or any solvent for any type of surface prep or treatment. To achieve good bonding and drying, the ideal
ambient temperature should be between 50°F and 80°F and humidity below 50%.
Application:
PAINT & PATINAS Spray application is the preferred method, although brushing or flow coating may be used. If applying with
a brush, use a high quality natural bristle brush. When using the matte formula, brushing is not advised. Any
dust collected on the cleaned metal should be blown or wiped off with a clean cloth before coating is applied.
Coating should be applied in full coats. The second coat should be applied in about an hour. If you are unable to
apply the second coat in a timely manner, you may lightly sand the first coat, so that the second coat will adhere.
Take measures to minimize dust and debris falling on your coated products. Metal surfaces should be at room
temperature (70°F–85°F).
SPRAY: Thinning is not necessary, or recommended, when using spray equipment with Ever Clear. If thinning is
desired, use up to 20% Sculpt Nouveau Solvent Thinner. For best results use a good quality HVLP sprayer. Make
sure that the spray equipment is clean and at room temperature. Spray at the lowest possible psi so that it lays
down lightly, usually about 20 psi with a 1.2 - 1.4 orifice tip.
DRYING TIME: The coating air dries to the touch in less than 1 hour – depending on room temperature and
may be forced dried faster at 250°F. The coating air dries solid/hard film within 4 hours, depending on coating
thickness, temperature, etc. Full cure dry time will be 5-7 days.
Ever Clear two-part is packaged with detailed instructions and filters for mixing. One gallon typically covers
125 sq. ft. with the recommended 2 coats.
T: 908.757.2323 ✛ F: 908.757.3439
338 AISALES@ARCHIRONDESIGN.COM ✛ ARCHIRONDESIGN.COM

